CLIENT: The Chief Engineer, Highway Zone,PWD, AP, Itanagar, Arunachal Pradesh. Project Period: June 2009 to July 2009.
CLIENT: The Superintending Engineer, P.W.D., N.H. Circle, Dibrugarh, Assam.
CLIENT: The Chief Engineer, PWD, PMGSY Works - Assam, Chandmari, Guwahati-3, Assam.
CLIENT: The Superintending Engineer, P.W.D., N.H. Circle, Dibrugarh, Assam
CLIENT: The Chief Engineer, P.W.D.(Roads), Meghalaya, NEC Branch, Shillong. Project Period: September 2008 to December 2008.
