Completed Project

  • Consulting Services for preparation of Detailed Project reportfor "Zoo-Japorigog to Noonmati Road along the hill side"


    CLIENT: The Chief Engineer, P.W.D. (Roads), Assam, Chandmari, Guwahati-3

  • Consultancy services for construction of Indo-Bhutan border road. First Phase from Chikaridanga to Rajagarh SSB Camp.(Total Length - 60.18 km).

    CLIENT: The Executive Engineer, P.W.D.(NH Division), Rangiya Division, Rangiya, Assam.

  • Detailed topographic Survey along the existing road from Shantipur to Roing along the existing National Highway by taking cross sections at 50m interval and all existing features like rivers, permanent structures, channels,buildings, culverts etc. and developing the geometric design as per IRC and quality calculation.(Total Length - 19.50 km).

    CLIENT: The Executive Engineer, PWD,Rowing PWD Division, Arunachal Pradesh.

  • Preparation of DPR for up-gradation of 2 lanning of Ratachera - Chauraibari section ofNH-44 under Phase - A of SARDP-NE done by under PWD NH Division, Silchar.(Total Length - 13.47 km).

    CLIENT: The Executive Engineer, P.W.D.(NH Division), Silchar, Assam.

  • Project Consultancy services Phase-I for the scheme "Raising & Strengthening the Brahmaputra Dyke from Sissikalghar to Tekeliphuta including closing of Breach by Retirement and Anti-Erosion Measures" (To protect Majuli and Dhakuakhana areas against flood devastation by the river Brahmaputra).

    CLIENT: The Chief Engineer, Water Resources Department, Chandmari, Guwahati-3, Assam. Project Period: October 2008 to December 2008.