4 lane connectivity from Nagaon to Itanagar in Arunachal Pradesh
under SARDP NE work (Phase A). 4 laning of NH 52 from the end of Biswanath Chariali
Byepass (KM 208/00) to Gohpur (km 265/500) (Total Length = 57.50 km) in Sonitpur
District in the State of Assam.
CLIENT: NHIDCL
CONTRACTOR: RAMKY TK JV
2-laning of existing Akajan- Likabali Bame road on EPC basis from
design km. 12.000 to km. 33.000 (existing km. 12.000 to km. 36.000) in the state of
Arunachal Pradesh under SARDP-NE Length: 21.8 km
CLIENT: NHIDCL
CONTRACTOR: JKM - KCL JV
Strengthening & Widening of NH-44 from Km. 173/125 to Km. 175/900,Km.
191/00 to km 197/00,Km. 197/00 to Km 206/500 of NH-44(Length = 18.275 Km.) in EPC
mode under PWD Silchar NH Division, in the state of Assam. Length: 18.275 KM
CLIENT: MoRTH
CONTRACTOR: M/s SGCCL - DP JV
Re-Alignment of NH-37 from Bogibeel Junction at Km. 581.700 to Km.
597.147 under SARDP-NE (Total length 15.447Km.) in the State of Assam (Dibrugarh
Bypass) Length: 15.447 KM
CLIENT: NHIDCL
CONTRACTOR: M/s ABCI - JKM JV
Development & upgradation of 4 Lanning of NH52 from Gohpur to Holongi
in the State of Assam. Length: 10.00 KM
CLIENT: NHIDCL
CONTRACTOR: ECI Engineering & Construction Company Ltd