Proof Consultancy Project

  • 4 lane connectivity from Nagaon to Itanagar in Arunachal Pradesh under SARDP NE work (Phase A). 4 laning of NH 52 from the end of Biswanath Chariali Byepass (KM 208/00) to Gohpur (km 265/500) (Total Length = 57.50 km) in Sonitpur District in the State of Assam.

    CLIENT: NHIDCL

    CONTRACTOR: RAMKY TK JV

  • 2-laning of existing Akajan- Likabali Bame road on EPC basis from design km. 12.000 to km. 33.000 (existing km. 12.000 to km. 36.000) in the state of Arunachal Pradesh under SARDP-NE Length: 21.8 km

    CLIENT: NHIDCL

    CONTRACTOR: JKM - KCL JV

  • Strengthening & Widening of NH-44 from Km. 173/125 to Km. 175/900,Km. 191/00 to km 197/00,Km. 197/00 to Km 206/500 of NH-44(Length = 18.275 Km.) in EPC mode under PWD Silchar NH Division, in the state of Assam. Length: 18.275 KM

    CLIENT: MoRTH

    CONTRACTOR: M/s SGCCL - DP JV

  • Re-Alignment of NH-37 from Bogibeel Junction at Km. 581.700 to Km. 597.147 under SARDP-NE (Total length 15.447Km.) in the State of Assam (Dibrugarh Bypass) Length: 15.447 KM

    CLIENT: NHIDCL

    CONTRACTOR: M/s ABCI - JKM JV

  • Development & upgradation of 4 Lanning of NH52 from Gohpur to Holongi in the State of Assam. Length: 10.00 KM

    CLIENT: NHIDCL

    CONTRACTOR: ECI Engineering & Construction Company Ltd