Proof Consultancy Project

  • Four Laning of NH-37 from end of Nagaon Bypass to Rangagara (CH: 288.600 KM to CH:297.000 KM) in Nagaon District in the State of Assam under SARDP-NE, Phase A on EPC Mode (Nagaon).

    CLIENT: Assam,PWD

    CONTRACTOR: Ganga Sagar Singh,Civil Contractor Class A Contractor Regd.with PWD,Lucknow

  • Strengthening of existing 2 lane with paved shoulder from Km.445/00 to 455/00 and Km.475/00 to 500/00, km (Total Length=35.00 km) of N.H.-52 (New N.H.-15) under Annual Plan for the year of 2018-19 under Nagaon N.H. Division, Nagaon in the State of Assam on EPC mode. (Silapathar Nahata)

    CLIENT: Assam, PWD

    CONTRACTOR: M/s Sanwar Mal Khetawat

  • Periodic Renewal for the year 2019-20 from Km. 398.050 TO Km. 408.000 ( Total length = 9.95 Km. ) of NH-15 under PWD Nagaon N.H. division, Nagaon in the state of Assam on EPC mode. (Chamajan).

    CLIENT: Assam,PWD

    CONTRACTOR: M/s Premdhan Construction

  • Strengthening of 2 lane with paved shoulder of NH-54 from 12th km to 40th km under Annual plan for the year 2018-19 under EPC mode under PWD, N.H. Division, Silchar in the State of Assam. (Silchar).

    CLIENT: Assam,PWD

    CONTRACTOR: UCN Construction Company Pvt.Ltd.

  • Stage strengthening to N.H.-53 (Silchar Badarpur section) from Km.3.65 to KM.6.25 and NH-54 at 21st. km, 27th km to 30th km, 35th km, 36th km and 40th km in stretches for 2019-20 on EPC mode under PWD, NH Division, Silchar in the state of Assam. (Silchar ).

    CLIENT: Assam,PWD

    CONTRACTOR: Binni Construction