  • Periodic Renewal for the year 2019-2020 from Km 373/425 (Total length = 23.425 Km) of NH-15 under ngaon Division Nagaon on EPC Mode in the State of Assam.

    CLIENT: Assam,PWD

    CONTRACTOR: M/s Premdhan Construction

  • Construction of 2 lane specification Road with paved shoulders realignment (Greenfield alignment) of the existing stretch between Legship to Gyaishing of NH 510 (design chainage KM 58.840 to KM 75.00) under SARDP NE Phase A on EPC basis in the state of Sikkim(Package V)

    CLIENT: Authority: NHIDCL

    CONTRACTOR: Rahi Infratech

  • Widening including paved shoulder from Km 64/00 to Km 76/00 & Km 79/00 to Km 85/00 (Total Length = 18.00 Km) on NH 51 in the State of Meghalaya.

    CLIENT: Authority: Ministry of Road Transport and Highways

    CONTRACTOR: MIDAS Construction

  • "Improvement of existing single / Intermediate lane of NH 44 to 2 lane with paved shoulder from Km 230/200 to Km 247/000, Km 261/504 (Ex. Ch. 260/109) to Km 263/191 (Ex. Ch.261/761) and Km 272/241 (Ex. Ch. 271/000) to Km 284/033 (Ex. Ch. 284/053) (Total Length=30.28Km) under SARDP NE (Phase A) in the State of Assam

    CLIENT: Authority: Ministry of Road Transport and Highways

    CONTRACTOR: BINNYCONSTRUCTION

  • Improvement/Widening to two-lane with earthen shoulder of Ranikor Maheshkola Baghmara State Road section from Rongara to Panda, existing chainage from Km 85.70 to KM 102.30 ( Design Chainage from km 81.1 to km 96.00) design length of 14.63 km on EPC mode under SARDP NE ‘Phase A’ in the state of Meghalaya” (Package No: IV)

    CLIENT: NHIDCL