Proof Consultancy Project

  • Stage Strengthening from km.928/00 to 938/00 ( Total length =10.00km) of NH-17 (new)/ NH-31 (old) under Abhayapuri Construction Division, Abhayapuri for the Annual Plan 2019-20 in the state of Assam under EPC Mode. (Abhayapuri ).

    CLIENT: Assam,PWD

    CONTRACTOR: M/s G.L.Agarwalla

  • Stage Strengthening from km.42/00 to km.52/00 on NH-37 (old)/ NH-17 (new) for the year 2019-20 under Guwahati N.H. Division in the state of Assam under EPC Mode. (Dudhnoi ).

    CLIENT: Assam,PWD

    CONTRACTOR: M/s G.L.Agarwalla

  • Periodical Renewal to N.H.-15 (Old N.H.-52) from Km.100.00 to 109.00 for the year 2019-20 in the state of Assam on EPC mode Job. (Dhekiajuli ).

    CLIENT: Assam,PWD

    CONTRACTOR: M/s Sanwar Mal Khetawat

  • Stage Strengthening from Km. 0/00 to Km.30/00 of NH-39 (old) in the state of Assam under Golaghat N.H. Division under EPC Mode under AP 2019-20. (Golaghat ).

    CLIENT: Assam,PWD

    CONTRACTOR: M/s G.L.Agarwalla

  • Periodic Renewal for the year 2010-2020 from Km 365/000 to Km 373/000 (Total length = 8.00 Km) of NH- 15 under Nagaon NH Division,Nagaon in the State of Assam.

    CLIENT: Assam,PWD

    CONTRACTOR: M/s Premdhan Construction